Well the machine is up and running. And i have tried to make it as rigid as possible. I still don't have any plans for the hardware I just build it from the images in my head. ;-)
But here is some pictures.
Here you have the heat chamber and the piston.
Heat protection!
This is the top of the tower.
Everything is made adjustable!
Safety first :-D
Some of my welding.
The mechanism of the piston arm. with a lock in the top position.
some links to make the piston move straight down in the heat chamber.
And here is everything in place and it's alive :-D
Some brass spacers.
And the nozzle.
this is the heat chamber mounting whit a spring to lift the nozzle after the injection.
that's all for now next time I'm going to show how i did my first mold.